Both in terms of PT and the knitting.
At PT they’re upping the weights in hand, and changing up the exercises, as they should be doing. I’m mostly fine on steps now, still some numbness when I kneel on the knee, and I can walk and bike pretty much normally. Zero cardio capacity at the moment, though, so I need to get on the bike more to help build that back.
Four more rows on the shawl. I’m 70% there, but with a lot more to go. I’m determined to get through this, though I may break and do a dishcloth or two when I need a small piece.
My nieces are all crocheting these days, and it’s fun to watch them finish things.